Skip to main contentSkip to navigationSkip to contactAccessibility (Alt+A)

Keyboard Shortcuts

  • Alt + A: Open accessibility settings
  • Tab: Navigate to next element
  • Shift + Tab: Navigate to previous element
  • Enter or Space: Activate buttons and links
  • Escape: Close dialogs and menus
  • Arrow keys: Navigate within menus and sliders
  • Home: Go to beginning of list
  • End: Go to end of list
EmersonEIMS — Reliable Power. Without Limits.
INDUSTRIES
CONTACT
Get Quote

B2BEmersonEIMS serves commercial, industrial, healthcare, telecom, hospitality, government & contractor clients.• Engineering-led • SLA-backed • Documented commissioning

Talk to an engineerWhatsApp+254 768 860 665

Services Directory

View all services →

Power & Generators

  • Cummins Generators (3-yr warranty)
  • Generator Repairs & Maintenance
  • ATS / Changeovers
  • Generator Sales
  • Generator Rental
  • Generator Installation
  • Generator Spare Parts
  • Workshop Repairs & Fabrication
  • Power Interruption Solutions

Renewable & UPS

  • Solar Energy Solutions
  • Commercial / Industrial Solar
  • Solar System Sizing
  • Solar Genius Pro™
  • UPS Systems
  • UPS Lab
  • Solar / UPS Hub
  • Borehole Pumps

Electrical & HVAC

  • Distribution Boards & Panels
  • Motor Rewinding
  • Motors & Drives
  • High-Voltage Systems
  • Diesel Automation
  • Industrial Controls
  • Steel Fabrication
  • AC / HVAC Installation

Specialised & AI Suites

  • Hospital Incinerators
  • Incinerator Construction Guide
  • Building Engineering Suite
  • EIMS PRO Workspace
  • AquaScan Pro™
  • Generator Oracle™
  • Plant & Equipment Oracle
  • Diagnostics Hub
  • Troubleshooting Wizard

Maintenance Hubs

  • Generator Maintenance
  • Solar Maintenance
  • HVAC Maintenance
  • Borehole Maintenance
  • Electrical Maintenance
  • Motors Maintenance
  • Incinerator Maintenance
  • Fabrication & Welding

Resources & Tools

  • Repair Centre — 60 free guides
  • Spare Parts Marketplace
  • Sectors We Serve
  • Brands We Service
  • All Engineering Tools
  • Resources & Learning Hub
  • Knowledge Base
  • Technical Bible
  • Power Calculators
  • Fault Code Database
  • Blog & Articles
  • FAQ
  • Emergency Response Guide

Service Areas

  • All Kenya — 47 Counties
  • Nairobi
  • Mombasa
  • Kisumu
  • Nakuru
  • Kiambu
  • All Service Locations
  • East Africa
  • Kampala, Uganda
  • Dar es Salaam, Tanzania
  • Kigali, Rwanda
  • Juba, South Sudan
  • Site Directory — every page
EMERSONEiMS

Engineering-grade reliability for East Africa's critical infrastructure. Power systems built to perform.

  • LinkedIn↗
  • Twitter↗
  • Facebook↗

Company

  • About Us
  • All Services
  • Prices & Costs
  • Book a Service
  • Project Gallery
  • Case Studies
  • Industries Served
  • Careers
  • Contact Us

Quick Links

  • Generator Sales
  • Solar Energy
  • Diagnostic Suite
  • Solar / UPS Hub
  • Generator Oracle
  • Knowledge Base
  • FAQ

Contact

  • Nairobi HQEmbakasi, off Airport North Road, Nairobi
    (Near KEMSA Head Office)
  • Department Emails
    • General Inquiriesinfo@emersoneims.com
    • Service Coordinationemersoneimservices@emersoneims.com
    • Generator Deskgenerators@emersoneims.com
    • Solar & UPS Desksolar@emersoneims.com
    • Sally — Direct Accountsally@emersoneims.com
  • Phone
    +254782914717
    +254768860665

© 2026 Emerson EiMS. All rights reserved.

PROTECTED BY GENERATOR ORACLE / EMERSONEIMS
Privacy PolicyTerms of Service
ENGINEERED IN NAIROBI, KENYA
Home/Pricing

Published price guide · 2026

Motor rewinding cost in Kenya

Rewinding is usually the cheaper answer, but not always. A badly rewound motor loses efficiency permanently and costs more in electricity than the rewind saved, so the honest comparison is against the price of a new motor and the running cost of both.

Every figure below is already published on our service pricing page. We put it here so it can be found by the question you actually asked.

Motor rewinding cost in Kenya — indicative ranges in Kenyan shillings
ItemPrice rangeTypical use
Motor rewinding, 5–15 HPCommon choiceKES 50,000 – 150,0003–5 days
Motor rewinding, 20–75 HPKES 150,000 – 500,0005–7 days
Motor repair & testingKES 40,000 – 120,0002–4 days
Motor efficiency analysisKES 20,000 – 50,0001 day

What moves the price

  • Frame size and horsepower — the copper alone scales with the motor.
  • Winding configuration. A multi-speed or special-voltage winding takes longer to strip, record and rebuild.
  • Whether the core is damaged. A burnt stator core needs restacking or relamination, and at that point replacement is often the better economics.
  • Copper price at the time of the job — it is the dominant material cost and it moves.
  • Bearings, shaft and fan condition, which are usually replaced during a rewind rather than left to fail afterwards.

What the figure excludes

  • New bearings, shaft machining or fan replacement where condition requires it
  • Removal from and refitting to the driven machine
  • Transport of the motor to and from our workshop
  • Figures are ex-VAT unless stated. Kenyan VAT is 16%, so a KES 600,000 quotation is KES 696,000 payable.

Get a firm figure for your site

A range is honest but it is not a quotation. Tell us the load and the location and you get a specific number, from an engineer, not a call centre.

Or call +254 768 860 665 — Embakasi workshop, engineers across all 47 counties.

Related

Motor rewinding in detail →Motors & drives →All service pricing →Generator prices in Kenya →Solar installation cost in Kenya →Borehole pump and rehabilitation costs in Kenya →UPS and inverter prices in Kenya →Borehole drilling cost in Kenya →Generator servicing and repair costs in Kenya →Incinerator prices in Kenya →