1. Auto Mains Failure (AMF): the start sequence
The core job of a standby controller is Auto Mains Failure (AMF): detect that the grid has failed, start the generator, prove it is healthy, transfer the load, and then reverse all of that cleanly when the grid returns. The sequence is deliberately timed — a short start delay ignores momentary dips so the set does not crank for a one-second flicker; a warm-up lets oil pressure and frequency stabilise before the load is applied; and on return, a return delay confirms the grid is genuinely back before transferring, followed by a cool-down run so the engine sheds heat before stopping.
Each of those timers exists for a reason, and badly set ones cause real problems: too short a start delay wears the starter on every flicker; no cool-down cooks the turbocharger. We commission these settings to the engine and the site, not to factory defaults, because the controller's timing is the difference between a set that lasts and one that is quietly abused on every outage.