Set load and site conditions; get a transparent recommendation in kVA, L/h and kWh. Heuristics shown — replace with authoritative tables before quoting.
Synthetic estimate from sizing inputs. Real measurements require an installed power-quality analyser.
Altitude 1,700 m · ambient 28°C.
Continue the engineering loop — sizing, audit, intelligence, diagnostics, solar/UPS, library.