EmersonEIMS — Reliable Power. Without Limits.
HOMEABOUT
CONTACT
Get Quote
EMERSONEiMS

Engineering-grade reliability for East Africa's critical infrastructure. Power systems built to perform.

  • LinkedIn↗
  • Twitter↗
  • Facebook↗

Company

  • About Us
  • Services
  • Book a Service
  • Project Gallery
  • Careers
  • Contact Us

Solutions

  • Generators
  • Solar Energy
  • Diagnostic Suite
  • Troubleshooting
  • Knowledge Base
  • FAQ

Service Areas

  • All Kenya Counties
  • Nairobi
  • Mombasa
  • Kisumu
  • Nakuru
  • Kiambu

Contact

  • Nairobi HQEmbakasi, off Airport North Road, Nairobi
    (Near KEMSA Head Office)
  • Emailinfo@emersoneims.com
  • Phone
    +254782914717
    +254768860665

© 2026 Emerson EiMS. All rights reserved.

Privacy PolicyTerms of Service
ENGINEERED IN NAIROBI, KENYA
SUResourcesSolar & UPS Intelligence Hub
VerifierSimulatorAuditCatalogueInstallAuthenticMaintainSafetyAbusePQLifecycleDocs PackLearnDiagnosticsSolar/UPSLibrary
Audience
  1. Home/
  2. Resources/
  3. Solar & UPS Intelligence Hub/
  4. Documentation Pack

Documentation Pack

A field-ready installer / commissioning bundle. Fill the header, print, and hand over with the as-built drawings.

Step 1

Project meta

Fill in the project header, then preview the bundle below. Use your browser's Print → Save as PDF to export.

Demo data
Emerson Industrial Maintenance Services

Installation & Commissioning Pack

SME solar + UPS hybrid
Ref: EIMS-2026-XXXX
Date: 2026-05-04
Client:
[Client name]
Site:
[Site address]
Contact:
[Site contact + phone]
Scope:
Supply, install, commission and hand over.
System
10 kW
Battery
14.4 kWh
UPS
6 kVA
PV
8 kWp
Genset
0 kVA
Section A

Single-line diagram (reference)

Use as a blueprint; redraw to scale on as-built.

  1. PV array → DC isolator → hybrid inverter (with grid + genset port)
  2. Battery bank → BMS → DC fuse → inverter DC bus
  3. Hybrid inverter AC out → ATS → critical loads MCB
  4. Online double-conversion UPS in parallel for IT racks (kVA per rack)
  5. Earthing TN-S, separate electrode for PV array, equipotential bond
  6. SPD Type 1+2 at main board, Type 2 at sub-boards, Type 3 at rack
Section B

Commissioning checklist

Tick on the printed copy. Engineer signs each block.

Mechanical
  • ☐Equipment torqued to spec (record values in margin)
  • ☐PV modules secured, no shading, MC4 connectors crimped + sealed
  • ☐Battery rack bolted, terminals torqued, no swollen cells
  • ☐Cable trays/ducts mechanically supported, no sharp edges, fire-stopped at penetrations
  • ☐Genset mountings on anti-vibration pads, exhaust hangers, fuel lines secured
Electrical
  • ☐Insulation resistance ≥ 1 MΩ on all circuits (record per circuit)
  • ☐Earth-electrode resistance measured and recorded (target ≤ 10 Ω; ≤ 1 Ω data-centre)
  • ☐Continuity of protective conductors verified end-to-end
  • ☐RCD trip times within IEC 61008 limits at I_Δn and 5×I_Δn
  • ☐Polarity verified at every socket/outlet on UPS + bypass paths
  • ☐SPD indicator windows green; Type 1 verified ≤ 25 kA (10/350 µs) where required
Functional
  • ☐Loss-of-mains test: load transfers to UPS / battery within rated time
  • ☐Genset start: cranks, syncs, picks up load on ATS within 10 s
  • ☐Return-to-mains: open transition, no equipment trip
  • ☐Inverter island mode tested with grid open
  • ☐Battery cycled to ≥ 80 % DoD then recharged; capacity ≥ 90 % nameplate
  • ☐Alarm console reachable on site network; SNMP/Modbus tags verified
Safety & handover
  • ☐Fire extinguishers per matrix (CO₂ for electrical, ABC for general, F-class for kitchens)
  • ☐PPE on site: insulated gloves Class 0, face shield, arc-rated jacket where Ik > 6 kA
  • ☐Single-line diagram printed and laminated at panel
  • ☐Operator trained: start/stop, alarm response, emergency shutdown
  • ☐Service contract & SLA explained, next service date scheduled
  • ☐As-built drawings + test certificates handed over
Section C

Acceptance test record

TestResultEngineer initials
Pre-commissioning checks☐ Pass / ☐ Fail____________________
Earth-electrode resistance____ Ω____________________
Insulation resistance min.____ MΩ____________________
Loss-of-mains transfer time____ ms____________________
Genset start time____ s____________________
Battery autonomy at full load____ min____________________
UPS efficiency (online)____ %____________________
THD at PCC____ %____________________
Operator training delivered☐ Yes / ☐ No____________________
Documentation handed over☐ Yes / ☐ No____________________
Section D

Sign-off

Installation engineer
Name / Signature
Date
Client representative
Name / Signature
Date
Use this with

Connected workflow

Pull the architecture and SLD reference from the Installation Visualizer; carry maintenance frequencies forward into the Maintenance Planner.

One platform · 16 tools

Connected workspace

Continue the engineering loop — sizing, audit, intelligence, diagnostics, solar/UPS, library.

  • VerifierCombination VerifierOpen →
  • SimulatorSmart SizingOpen →
  • AuditQuotation AuditOpen →
  • CatalogueProduct IntelligenceOpen →
  • InstallInstallation VisualizerOpen →
  • AuthenticAuthenticity CheckOpen →
  • MaintainMaintenance PlannerOpen →
  • SafetySafety & FireOpen →
  • AbuseAbuse PredictorOpen →
  • PQPower QualityOpen →
  • LifecycleLifecycle CostOpen →
  • LearnLearning ModeOpen →
  • DiagnosticsDiagnosticsOpen →
  • Solar/UPSSolar & UPSOpen →
  • LibraryLibraryOpen →
Sample values labelled Demo data·Hub v1.0.0-rc.1·staging·Reviewed 2026-05-03·Audit trail