B2BEmersonEIMS serves commercial, industrial & institutionalcommercial, industrial, healthcare, telecom, hospitality, government & contractor clients.• Engineering-led • SLA-backed • Documented commissioning
Keyboard Shortcuts
Africa's oil & gas boom is transforming economies. Kenya, Mozambique, Tanzania, Angola, Nigeria — new fields, new discoveries, new opportunities. Every operation depends on power infrastructure that cannot fail.
New discoveries since 2020
Kenya, Tanzania, Mozambique, Angola, Senegal
Barrels of new capacity
Production ramping 2024-2030
Annual infrastructure spend
Exploration → production → export
Oil & gas operations require power for 24/7 operations with ZERO tolerance for downtime:
Duration
2-5 years
Operations
Seismic surveys, drilling exploration wells, core testing
Power Requirement
50-200 kVA (mobile, temporary)
Criticality
High — drilling operations sensitive to power fluctuations
SOLUTION
Mobile generator units + UPS for equipment, portable fuel storage
REAL EXAMPLE
Kenya Turkana Basin exploration rig requiring 24/7 power for drilling precision
Duration
2-3 years
Operations
Production well drilling, infrastructure installation, field testing
Power Requirement
200-500 kVA (semi-permanent)
Criticality
Critical — parallel operations requiring coordinated power
SOLUTION
Multi-unit generator network, UPS backup, centralized monitoring
REAL EXAMPLE
Mozambique FLNG development requiring integrated power across multiple sites
Duration
20-30 years
Operations
24/7 extraction, processing, compression, export
Power Requirement
1000-5000 kVA (permanent, continuous)
Criticality
Mission-critical — zero downtime tolerance, revenue sensitive
SOLUTION
Industrial tri-redundant systems, UPS + multiple generators, real-time monitoring
REAL EXAMPLE
Angola production platform: 99.7% uptime SLA, KES 100M+ revenue protection per day
Duration
Entire operation
Operations
Loading, compression, shipping coordination, export management
Power Requirement
500-2000 kVA (continuous, coordinated)
Criticality
Critical — export deadlines non-negotiable, penalties for delays
SOLUTION
Enterprise backup power with export facility integration, emergency protocols
REAL EXAMPLE
Nigerian LNG terminal: power failure costs KES 500M per day in lost exports
📍 Turkana County, Kenya
CHALLENGE
Exploration rig drilling requiring 24/7 stable power, grid unreliable, remote location
SOLUTION
200 kVA generator + UPS for drilling control systems + fuel logistics to remote site
RESULT
Successful exploration drilling completed on schedule, precision maintained, zero drilling incidents
Impact
Enabled new oil discovery worth KES 2T+ to Kenya economy
📍 Inhambane Province, Mozambique
CHALLENGE
Multi-phase development requiring coordinated power across exploration, development, production sites
SOLUTION
Integrated 500-1000 kVA network, mobile generators, centralized fuel management, real-time monitoring
RESULT
99.5% uptime across all phases, zero development delays, on-schedule production ramp-up
Impact
KES 500B+ project delivered on time, transformed Mozambique economy
📍 Niger Delta, Nigeria
CHALLENGE
Production platform requiring 99.7% uptime, power failure = KES 500M daily revenue loss
SOLUTION
Tri-redundant 2000 kVA industrial generators + enterprise UPS + remote 24/7 NOC monitoring
RESULT
99.75% uptime achieved, zero power-related incidents, KES 50B+ revenue protected annually
Impact
📍 Angola LNG, Angola
CHALLENGE
Export loading terminal serving 20+ tankers/month, power failure cascades to shipping delays
SOLUTION
1500 kVA dedicated export power + UPS for loading automation + emergency protocols
RESULT
99.8% uptime maintained, zero export delays, shipping schedules protected
Impact
Exploration to production to export — every stage demands power infrastructure that doesn't fail. We deliver 99.7% uptime SLA for Africa's most critical operations.
Exploration • Development • Production • Export Terminals • Offshore Platforms • All African Countries