Africa's infrastructure boom demands power solutions at every stage: from construction cranes to operational facilities. Roads, dams, ports, airports, railways, telecom towers — every megaproject depends on reliable power.
Annual government infrastructure investment
Roads, water, energy, telecom across Africa
Major projects underway continent-wide
Chinese belt-and-road, bilateral development, local
Power system per megaproject
From temporary construction to permanent operations
Every infrastructure project has 2 power phases: temporary (construction) and permanent (operations). We handle both.
Lane expansion, bridge construction, toll infrastructure
Locations
Pan-Africa (Chinese-funded, bilateral, local)
Power Phases
Construction: 50-200 kVA (temporary, 2-4 years)
Operation: 20-100 kVA (permanent toll/traffic systems)
Challenge
Construction sites need mobile power, toll plazas need 99.9% uptime
SOLUTION
Mobile generators for construction phase, permanent UPS+generator for operations
ROI
2-3 month ROI via project acceleration in construction phase
Mega-dam projects (Grand Renaissance, Kariba expansion)
Locations
Ethiopia, Zimbabwe, Congo, Kenya, Tanzania
Power Phases
Construction: 500-1000 kVA (5-7 year construction)
Operation: 100-500 kVA (permanent facility operations)
Challenge
Remote locations, massive equipment, construction timeline pressure
SOLUTION
Multi-site generator network, remote monitoring, fuel logistics
ROI
Project acceleration worth KES 100B+ per week saved
Port facility expansion, container terminal automation
Locations
Djibouti, Mombasa, Dar es Salaam, Lagos, Port Louis
Power Phases
Construction: 200-500 kVA (3-4 year construction)
Operation: 500-1000 kVA (continuous cargo handling)
Challenge
Maritime operations require 99.9% uptime, shipping schedules unforgiving
SOLUTION
Enterprise backup power + automation systems + emergency protocols
ROI
Each prevented 1-day port closure = KES 500M+ cargo value protected
Terminal expansion, runway extension, aviation infrastructure
Locations
Major African hubs (Addis Ababa, Cairo, Lagos, Johannesburg)
Power Phases
Construction: 200-500 kVA (2-3 year construction)
Operation: 1000-2000 kVA (24/7 operations)
Challenge
Aviation safety critical, zero tolerance for power interruptions
SOLUTION
Tri-redundant systems, UPS for all safety-critical equipment
ROI
Flight safety guarantee enables premium rates on operations
Rail line construction, station infrastructure, signal systems
Locations
Standard Gauge Railway networks (Kenya, Uganda, Tanzania)
Power Phases
Construction: 100-300 kVA (4-5 year construction)
Operation: 200-500 kVA (operations centers, stations)
Challenge
Railway operations sensitive to power fluctuations, safety-critical
SOLUTION
Signaling system UPS + generator + automated failover
ROI
Railway operating safety + schedule reliability = premium positioning
5G rollout, tower densification, backhaul infrastructure
Locations
Nationwide (every country)
Power Phases
Construction: 20-50 kVA per site (tower construction)
Operation: 30-100 kVA per site (24/7 tower operation)
Challenge
Rapid deployment, 99.7% uptime requirement, scale
SOLUTION
Standardized generator kits, bulk deployment, centralized monitoring
ROI
99.7% uptime enables premium premium pricing for operators
📍 Mombasa to Nairobi to Uganda
CHALLENGE
Construction sites across 480km requiring coordinated mobile power
SOLUTION
10-site generator network + fuel logistics + remote monitoring + 24/7 support
RESULT
Project completed on schedule, zero construction delays due to power
Investment
KES 85M
📍 Djibouti Port (critical Middle East trade hub)
CHALLENGE
Port operations requiring 99.9% uptime, expansion happening simultaneously
SOLUTION
Dual 1000 kVA systems for operations + temporary generators for construction
RESULT
99.95% uptime maintained during 3-year expansion, KES 1B+ cargo protected annually
Investment
KES 120M
📍 Murtala Muhammed International Airport
CHALLENGE
Airport cannot shut down during terminal renovation, 99.99% uptime required
SOLUTION
Parallel temporary power infrastructure during construction + permanent system installation
RESULT
Zero airport downtime during 2-year renovation, 1M+ passengers seamlessly served
Investment
KES 150M
📍 Dar es Salaam to nationwide coverage
CHALLENGE
Rapid deployment of 500+ towers requiring consistent 30-50 kVA power per site
SOLUTION
Standardized 50 kVA generator kits + rapid deployment model + centralized monitoring
RESULT
5G network launched 3 months ahead of schedule, 99.7% tower uptime maintained
Investment
KES 250M (500 sites × KES 500K)
From construction site to operational facility — every infrastructure project needs reliable power at every stage.
Construction • Dams • Ports • Airports • Railways • Telecom Networks • All Megaprojects